Top banner

rado diastar original review cartier santos 100 1904-2004 fake replica prada breitling navitimer 8 tag heuer connected 45 price hermes replica bags patek 5196 review who owns the most expensive watch in the world replica handbags tag heuer carrera day date review tag heuer carrera calibre 6 heritage review louis vuitton replica bags replica watches australia paypal tag heuer brand values replica chanel tag senna limited edition breitling aerospace yellow dial hermes replica

Stephen Metcalf Ltd - Shopfitters Joiners Builders


In 2014 the Company completed the successful rebuilding of the Grade 2 Listed Tram Shelter for West Yorkshire Integrated Transport Authority, along with Aedas Building Consultancy who acted as supervising Architects on the project. The 140 year old structure had fallen into disrepair before work commenced in early May 2014. The structure was completely disassembled and taken away to our workshop for renovation over an 8 week period. In June it returned to site to be painstakingly reassembled to its former glory.